Solar installer timesheet with kW and panels per day

Solar crews are easy to compare once you know how many labor hours each kilowatt takes. This timesheet adds kW installed and Panels installed to every row, so a few weeks of sheets tell you which crew is faster and how many hours to price into the next install.

The Excel file works out hours and pay. The first three rows are examples.

Solar installer timesheet

Download Excel (.xlsx)Download CSV

Free. No sign-up or email needed.

What’s in the template

Scroll sideways to see all columns.

First rows of the template, with sample data
DateInstallerJob / sitekW installedPanels installedStartFinishBreak (min)HoursHourly ratePayNotes
10/5/26Riley BrooksJohnson residence4.41007:0016:00308.530.00255.00Racking done
10/5/26Taylor ReedJohnson residence4.41007:0016:00308.524.00204.00
10/6/26Riley BrooksJohnson residence4907:0013:000630.00180.00Inverter wired

What each column is for

ColumnWhat to write
DateThe install day.
InstallerThe installer’s name, one row per job they worked on that day.
Job / siteThe customer or address.
kW installedThe kW the crew installed on this job that day. Put the same figure on each installer’s row, as in the example.
Panels installedThe number of panels the crew mounted on this job that day, again on each row.
StartWhen work started, for example 07:00.
FinishWhen work ended, for example 16:00.
Break (min)Unpaid break in minutes. Leave it blank or enter 0 if there was none.
HoursCalculated: finish minus start, minus the break.
Hourly rateThe installer’s hourly rate.
PayCalculated: hours × hourly rate.
NotesThe stage reached: racking done, panels on, inverter wired, waiting on inspection.

To get labor hours per kW for a job, add up its Hours and divide by the job’s kW, counting each day’s kW once rather than once per installer. In the sample rows, the Johnson job took 23 labor hours for 8.4 kW, about 2.7 hours per kW. Those are example numbers: yours depend on roof type, system size and crew.

When a spreadsheet stops working

  • The ratio is only as good as the hours. A day nobody logged makes a crew look faster than it is. HiVis emails the people who log time the morning after a workday when someone on an active job has no hours.
  • Overruns show up after the install. In HiVis each job can have a labor budget. Labor spend is shown against it while the job is on, and HiVis emails when spend gets close to the budget or goes over.
  • Materials leave without a record. In HiVis, stock issued to a job with its unit cost shows on the job’s Materials tab, next to the labor cost. See job costing in HiVis.

How to use it

  1. Download it and clear the examples

    Download the Excel file. Delete the three sample rows as whole rows, or clear only the columns you fill in: clearing Hours and Pay would remove their formulas.

  2. Fill in the header

    Company, the crew or foreman, the period and who approves the sheet. Keep one sheet per crew if you want to compare crews.

  3. Add one row per installer, job and day

    Write the day’s kW and panel count for the job on each installer’s row, along with their start, finish and break.

  4. Check the totals and approve

    The Total row adds up hours and pay. Before signing off in Approved by, check that every install day has its kW filled in.